PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing concrete planks at the 1st floor detention cells defdfggdfmvmm vnnxm.jpg Installing metal framing at the 3rd floor Facing North-East.jpg Installing storm piping at the 4th floor Facing East.jpg Installing Storm piping at the High Roof Facing West.jpg Interior metal Framing at the 3rd floor Waiting Area Facing North-West.jpg Laying out block at the 2nd floor UCIA Facing North-East.jpg Erecting the stone panels at the South Elevation 1.jpg Erecting the stone panels at the South Elevation 2.jpg Erecting the stone panels at the South Elevation 3.jpg
Previous pageNext page Interior metal Framing at the 3rd floor Waiting Area Facing North-West
Interior metal Framing at the 3rd floor Waiting Area Facing North-West